Select Git revision
  • 115-add-pcict-date-format-managment
  • 118-plot-outputsmodel-remove-case-sensitivity-to-the-which-argument
  • 136-decreased-performance-of-calibration-execution-time
  • 161-runmodel_lag-proposal-for-a-better-transformation-and-screening-of-the-parameters
  • 165-add-missing-isintstore-argument-in-createcaliboptions
  • 171-check-error-direct-call-of-as-data-frame-posixct-is-deprecated-use-as-data-frame-vector-or-as
  • 191-speed-up-runmodel_lag-when-it-is-used-alone
  • 33-merge-airgr-and-airgrplus-functions
  • 60-migrate-transfoparam-functions-and-createcaliboptions-to-s3-methods
  • 96-parallelize-the-grid-screening-step-during-calibration
  • airGRplus
  • dev default
  • master
  • rmOptions
  • CRAN_v1.7.6
  • CRAN_v1.7.5
  • CRAN_v1.7.4
  • CRAN_v1.7.3
  • CRAN_v1.7.2
  • CRAN_v1.7.1
  • CRAN_v1.7.0
  • CRAN_v1.6.12
  • CRAN_v1.6.11
  • CRAN_v1.6.10.4
  • CRAN_v1.6.9.27
  • CRAN_v1.6.9.24
  • CRAN_v1.6.9.23
  • CRAN_v1.6.9.21
  • CRAN_v1.4.3.65
  • CRAN_v1.4.3.60
  • CRAN_v1.4.3.52
  • CRAN_v1.3.2.42
  • CRAN_v1.3.2.41
  • CRAN_v1.3.2.40
You can move around the graph by using the arrow keys.
Created with Raphaël 2.2.018Dec16121110654222Nov20198423Sep2019186421Jun20191276429May24232221203217Apr16432129Mar282725222120191813128764128Feb252119151330Jan29181123Oct22171615105128Sep27262431Aug302928918Jul29Jun1522May4Apr1Feb30Jan6Dec516Nov109726Oct231728Sep2713127518Aug161112Jul1126Jun23222115131222May11Apr7531Mar301523Feb1623Jan20v1.4.3.18 DOC: dont run RunModel_GR5H example to pass CRAN check and new parameter values #13v1.4.3.17 DOC: minor example revision in RunModel_GR5H and RunModel_CemaNeigeGR5H doc #13v1.4.3.16 BUG: no visible binding for global variable Ind_Run fixed in Imax #13v1.4.3.15 DOC: missing IsIntStore argument added in usage of CreateIniStates doc #13v1.4.3.14 DOC: missing IntStore argument added in usage of CreateIniStates doc #13v1.4.3.13 DOC: missing bracket added in RunModel_GR5H docv1.4.3.12 DOC: major text revisions un RunModel_CemaNeigeGR5H #13v1.4.3.11 DOC: text revision in RunModelGR5H doc #13v1.4.3.10 CLEAN: minor revisions of error and warning messages in CreateRunOptions #13v1.4.3.9 DOC: minor text revisions in NEWS filev1.4.3.8 DOC: add a link to RunModel_CemaNeigeGR5H in RunModelGR5H doc #13v1.4.3.7 DOC: add RunModel_CemaNeigeGR5H doc #13v1.4.3.6 BUG: add missing conditionnal tests or computation, and variable name modifications in RunModel_CemaNeigeGR5H fun #13v1.4.3.5 BUG: wrong contionnal test fixed in CreatIniStates #13v1.4.3.4 UPDATE: conditionnal tests concerning the RunModel_CemaneiGR5H added in CreateInputsModel, CreateRunOptions , CreateIniStates and CreateCalibOptions and Calibration_Michel #13v1.4.3.3 UPDATE: Runmodel_CemaNeigeGR5H is now exported by NAMESPACE #13v1.4.3.2 BUG: incorrect number of parameters in CemaNeige has been fixed in RunModel_CemaNeigeGR5H #13v1.4.3.1 BUG: name of the function corrected in RunModel_CemaNeigeGR5H file (from RunModel_GR5H to RunModel_CemaNeigeGR5H) #13v1.4.3.0 NEW: add RunModel_CemaNeigeGR5H file #13vv1.4.2.20 DOC: minor police type correction in RunModel_GR5H docvv1.4.2.19 DOC: number of parameters corrected in RunModel_GR5H docv1.4.2.18 DOC: time step unit corrected in several outputs of RunModel_GR5H docv1.4.2.17 DOC: revisions of explanations and code corrections in Imax docv1.4.2.16 DOC: minor text revisions in CreateRunOptions docv1.4.2.15 UPDATE: conditionnal test modified to take into that no IniResLevels is a vector of length 4 in CreateRunOptions #13v1.4.2.14 BUG: minor revision of ES computation in frun_GR5H Fortran code #13v1.4.2.13 BUG: minor type revisions in CreatRunOptionsv1.4.2.12 BUG: EI value computation corrected in frun_GR5H Fortran subroutine #13v1.4.2.11 CLEAN: minor typo revision of an error message in CreateRunOptions #13v1.4.2.10 DOC: links to Imax doc added in CreateRunOptions and RunModelGR5H doc #13v1.4.2.9 DOC: diagram of GR4J removed from Imax docv1.4.2.8 DOC: Imax help page added #13v1.4.2.7 DOC: Imax argument added in CreatRunOptions doc #13v1.4.2.6 UPDATE: tested_values argument renamed into TestedValues into the Imax fun #13v1.4.2.5 CLEAN: minor syntax revision in Imax funv1.4.2.4 CLEAN: checks of inputs revised in Imax fun #13v1.4.2.3 DOC: link modified and added in RunModel_GR5H docv1.4.2.2 CLEAN: miror typo revisions of Imax fun #13v1.4.2.1 UPDATE: calculate_Imax fun renamed into Imax #13v1.4.2.0 NEW: added calculate_Imax fun to computethe maximum capacity of the GR5H interception store #13